Structural Steelwork
Mezzanine and floor steelwork
A steel mezzanine adds usable floor area inside an existing building without extending its footprint. The steel frame is the part TopTac makes: columns, main and secondary beams, and connection plates, fabricated to the layout you supply.

About this service
The photograph on this page shows floor steelwork being erected inside a building. Loadings, floor finishes and any approvals are matters for the project designer, and TopTac works from the drawings provided.
What this covers
- Columns and base plates
- Main and secondary floor beams
- Connection plates and fixings
- Stair and platform support steel
- Painted finishes
Relevant work
Projects using this service
Photographs from TopTac’s own projects.
What to send
Information that helps us quote
- The designer's layout drawings and loadings
- Floor-to-floor height and clear height needed
- Photographs of the space and access routes
- The floor finish or deck, if already chosen
- Your preferred timescale
Questions
Common questions
Does TopTac supply the floor surface?
The service here is the steel frame. If you need decking or a floor finish, mention it when you enquire so it can be discussed.
Who designs the mezzanine?
The loading and design should come from your engineer or designer. TopTac fabricates to the drawings supplied.
Guides and further reading
Need mezzanine floors?
Send your drawings or a few photographs and we will tell you what we need next.

